Breaking Capacity | Unit | CTHB15G | CTHB20G | CTHB30G | CTHB40G |
Unreinforced Concrete | yd3/day | 120-250 | 155-390 | 185-465 | 245-570 |
Reinforced Concrete | yd3/day | 80-160 | 110-240 | 130-290 | 150-340 |
Hard Rock | yd3/day | 160-300 | 220-560 | 265-660 | 310-810 |
*Day= 8 hours
*Because of varing conditions – (soil, concrete strengths, material thickness,etc.) Rate shown in this table may alter
*Because of varing conditions – (soil, concrete strengths, material thickness,etc.) Rate shown in this table may alter